For some years, GAEL Switchboards has worked in close association with
Foodstuffs and Owl Electrical on all New World and Pak N Save stores
from Taupo North. Traditionally, specifications have been prepared by
Lawrence Jones Partners to meet foodstuffs requirements which include
a high level system discrimination and generator back-up to ensure continuity
of supply to critical areas within the store.
GAEL Switchboards was responsible
for the main switchboard, distribution boards, managers control panels
and emergency lighting control. Owl Electricals Kevin Goodman
comments,
"GAEL Switchboards repeatedly meets tight delivery programmes
and are always available at short notice to make last minute changes
in-factory or on-site. Their service has always been nothing short of
excellent."
New Zealand Steel Industrial Motor Control
New Zealand Steel commissioned GAEL Switchboards to manufacture two
suites of variable speed drive equipment and distribution equipment enclosures
for High Bay Cranes in their slab making plant.
The contract called for
delivery in two parts. First was equipment for the East Crane comprising
a main distribution board, main hoist panel, long travel panel, auxiliary
hoist panel and cross traverse panel. A month later delivery of equipment
for the West Crane was required.
New Zealand Steel's Ray Burden
stated:
"The GAEL team performed beyond our expectations. The engineering
team came up with sound technical solutions, kept us well informed on
progress and were professional throughout the contract. The witness testing
demonstrated a high level of competence and the GAEL people were really
good to work with. We would have total confidence in using the team at
GAEL on future contracts".
Villa Maria Winery Distribution Boards... Including Stainless Steel
Villa Maria now has a new site located in Mangere which includes warehousing,
a bottling store and a barrel store. The contract for the warehouse called
for IP65 rated stainless steel cabinets to give protection against "dust
and water splashed in all directions".
Stainless steel cabinets
were supplied by Rittal and assembled to exacting site requirements by
GAEL specialists.
Mike Bakker from Allendale Electrical commented:
"The
distribution board specification called for non-standard specially
manufactured stainless steel enclosures that has the added problem
of lots of circuits
and cableway access difficulties.
"The DB's had to be re-jigged
by GAEL to make it work which they did, as well as assisting with other
modifications, quickly and with absolutely no fuss. A very good job...
congratulations to the GAEL team."
Mains-Generator Change-over Switchboard for Manukau Civic Buildings
United Gooder recently commissioned GAEL Switchboards to supply a 2000A
switchboard which was a little bit out of the ordinary. The board had
to be interfaced with a Building Management System (BMS) as well as a
generator control panel, it has to provide load shedding and power factor
shedding... and the system had to be fully automated.
The solution
came in the form of GAEL's new ELSTEEL Techno Main Switchboard,
complete with Merlin Gerin 2000A air circuit breakers.
United Gooders
Wayne Harrison requested the presence of GAEL's Nik Fili at on-site
commissioning on a Saturday morning. Wayne commented:
"The system
was up and running first time, everything went exactly as it should.
But in addition to commissioning, Nik also went the extra mile by providing
on-site training to Manukau Engineers. It's service like this that
ensures we'll continue to use GAEL on future contracts."
Consultant
Harvey Limbert said,
"The GAEL switchboard performed exactly to
expectation."
Edendale Substation 33kV Indoor Switchboard
A steadily increasing load in the Southland area led to the need to
expand the Edendale Substation, which in turn required the manufacture
of a new 33kV Indoor Switchboard. Acting as a sub-contractor to ABB,
GAEL provided busbar assembly, low voltage supervisory control and
factory testing.
The assembly work involved 33kV SF6 circuit breakers sourced from Italy
and switchboard housing and busbar componentry from Turkey. GAEL's role
was to manufacture all the low voltage control, assemble the switchboard,
fit VT's and CT's and carry out all testing.
Client, Powernet, commissioned Gibbons Consulting to inspect the switchboard
prior to delivery. Consultant Richard Gibbons commented,
"The switchboard manufactured by GAEL met all specifications,
witness testing went without a hitch and delivery was on schedule."
ABB Project Engineer, Alan Brownlie was impressed with the standard
of workmanship and on-time delivery to tight deadlines. The success of
this project has led to orders for two additional 33kV switchboards and
one 11kV switchboard.
Digger Cuts Cable to Refrigerated Blood Store NZ Blood / TS Bishop
NZ Blood stores critical supplies of blood under carefully controlled
refrigerated conditions, with a monitored 24 hour power supply. In the
event of a loss of power, the integrity of the blood stock is at risk
after only 20 minutes. So, as you would expect, a back-up generator sits
in
readiness to cope with any power failure.
However, all did not go exactly to plan when a digger operating close
by accidentally cut the supply cable causing power failure and a surge
to occur. This set in train a sequence of events which rendered the generator
change-over inoperable, putting the entire stock of blood at risk.
Quick action from the electrical contractor TS Bishop and GAEL Switchboards
resulted in the generator supplying power to the refrigerators within
just 20 minutes of the problem happening.
TS Bishop's Danny Collins commented:
"It was after- hours and a
real emergency, but the GAEL team responded immediately and got the Switchgear
sorted in no time...very impressive".
New Change-over Switchboard
Air New Zealand/ Dickson Gray
The airport branch of Dickson Gray are often called to do changes or
install switchboards at very short notice and with tight shut down times.
One such job occurred for Air New Zealand, an Emergency Standby Generator
Auto Transfer Switch (ATS) was required for the 24
hour emergency supply. GAEL Switchboards received the NHP enclosure
and change over switches Thursday afternoon and delivered the change
over
cubicle to site Saturday morning for installation by Dickson Gray.
Normally delivery would be 2-3 weeks.
Dickson Gray's site Project Manager, Grant Megson commented,
"The
GAEL team acted very quickly to fit and busbar connect the Auto Transfer
Switch... a great job, and as per normal done in a very short timescale".